WHAT’S BEEN DONE?

Phase 0 (Scope and Pre-Appraisal)

The purpose of Phase 0 is to ensure that the project aligns with current TII strategic programmes and plans.

Phase 0 was completed on the project, which was approved by the Department of Transport, Tourism and Sport (DTTAS) in 2019.

This confirmed that there is a need to examine the corridor in greater detail in Phase 1 (Concept and Feasibility) and to determine if an intervention (project) is required and if such an intervention is feasible.

Phase 1 (Concept and Feasibility)

The purpose of Phase 1 is to determine if an intervention (project) is required and if such an intervention is feasible.

Phase 1 has been completed on the project. This confirmed that an intervention (project) is required and that an intervention is feasible.